Greater Toronto & Hamilton Area

Fire door inspection

Every fire door in your building inspected, photographed and recorded — to the Ontario Fire Code and NFPA 80 criteria, with a report your fire inspector will accept.

The basics

What a fire door inspection actually is

A fire door is not a door. It is an assembly — leaf, frame, hinges, closer, latch, seals and glazing — tested and certified as a unit. Change any part of it and the certification no longer holds.

An inspection checks that assembly against a defined set of criteria. It is not a visual walk-past; it is a physical examination of each opening, checking clearances with a gauge, operating the door, confirming it latches under its own power, and reading the label.

The output is a record. That record is what proves compliance to a fire prevention officer, an insurer or a regulator — and without it, having inspected the doors is not the same as being able to show you did.

What we check

The inspection criteria, in plain language

Fire door assemblies are assessed against a defined checklist. Here is what each item means and why it matters.

Labels are present and legible

The label identifies the door’s rating and certification. Painted over, removed or damaged beyond reading, and the assembly cannot be verified as rated. This is the single most common deficiency we expect to find.

No holes or breaks

Holes drilled in the field for hardware that was later removed, or damage through the leaf or frame, compromise the assembly’s integrity.

Clearances within tolerance

The gaps at the head, jambs, meeting stiles and underside are specified and measured with a gauge, not estimated. Too wide and fire and smoke pass through.

Glazing and vision panels intact

Rated glazing, glazing beads and their fixings must be in place and undamaged, with no field-installed substitutions.

The door closes fully on its own

Released from any position, the self-closing device must return the door to the fully closed position without assistance.

Positive latching

The latch must engage the strike and hold the door closed under pressure. A door that swings shut but does not latch will be pushed open by a fire.

Coordinators and hardware functioning

On pairs, the coordinator must close the leaves in the right order. All hardware must be present, secure and operating as intended.

No unauthorised field modifications

Added hardware, cut-outs, applied materials or anything not part of the certified assembly invalidates the rating.

Gasketing and edge seals intact

Smoke seals and intumescent strips must be present, undamaged and not painted over. They are part of the rated assembly, not an accessory.

Signage and obstruction

Required signage present, and nothing wedging, blocking or holding the door open other than a listed hold-open that releases on alarm.

The deliverable

What you get back

The report is the product. The inspection is how we produce it.

  • Every opening numbered and tagged, so doors can be identified on site and in the record
  • A photograph of each deficiency, not a written description of one
  • Findings graded — code failure, developing wear, or cosmetic
  • A recommended correction against each finding
  • A summary for the building file and for your fire inspector
  • Records retained and carried forward, so next inspection compares to last

Graded, not dumped

A list of forty deficiencies with no priority is not useful — it is a budget problem with no starting point.

We separate what must be corrected to meet code from what will need attention within the year and what is purely cosmetic. Then you decide what to spend and when, and you have the reasoning in writing.

When doors fail

Most fire doors fail on something

This is normal and it is not a crisis. Industry inspection data consistently finds the large majority of fire doors fail on at least one criterion, and most failures are small and inexpensive.

A misaligned strike, a tired closer, a painted label, a missing seal. None of these require a new door. Most are resolved in under an hour by someone who knows what they are looking at.

We quote the remediation separately, and you are free to have it done by someone else. The report is yours either way — it is not held hostage to a repair order.

The label problem

Missing or illegible labels are the deficiency we expect to find most often, and the one people assume means replacing the door.

It often does not. Some embossed labels remain readable once paint is removed. Where a label is genuinely gone, re-labelling by a certified facility is sometimes possible — a fraction of the cost of a new rated assembly.

We will tell you which situation you are in before anyone quotes a replacement.

Who needs this

If your building has fire separations, it has fire doors

Stairwells, corridors, mechanical and electrical rooms, storage, service risers, between tenancies, and every exit route.

Office and commercial

Stairwells, corridors, risers and demising walls between tenancies.

Healthcare and long-term care

Heavy fire separation density and documentation regulators expect to see.

Industrial and warehouse

Rated separations between production, storage and office areas.

Institutional and retail

Schools, municipal buildings, shopping centres and multi-tenant retail.

Common questions

Inspection questions

How often do fire doors need inspecting in Ontario?
The Ontario Fire Code was amended effective 1 January 2026. Doors in fire separations now require monthly inspection under Section 2.2, and egress doors and doors with electromagnetic locking devices require monthly inspection plus annual testing under Section 2.7. Your local fire prevention officer is the authority on how this applies to your building, and we would always recommend confirming scope with them.
Who is allowed to inspect a fire door?
The standard requires a qualified person — someone who by training, knowledge and experience can demonstrate the ability to do the work. No single certification is legally mandated, and the Authority Having Jurisdiction ultimately decides what it will accept. Certification is how an inspector demonstrates qualification rather than a legal gate.
How long does an inspection take?
It depends on the number of openings and how accessible they are. We walk the building first and count the doors, so you know the scope and the time before committing. Most work can be scheduled around tenant hours.
What if we have never had an inspection?
Most buildings we look at have not. The first inspection establishes a baseline and usually produces the longest deficiency list you will ever get — after that, you are maintaining rather than catching up. It is a normal starting point, not a sign anything has gone badly wrong.
Do you inspect doors you did not install?
Yes. Almost all of them. We inspect the assembly as we find it, regardless of who supplied or fitted it.
Can you do the repairs as well?
Yes, and most clients prefer it, because deficiencies do not then sit in a report waiting for someone else to quote. But it is your choice, and the report does not depend on it.
Book an inspection

Find out where your doors stand

We will walk the building, count the openings in fire separations and tell you the scope of the obligation before anyone quotes a number.

Managing several buildings? We can assess the whole portfolio and quote it as one scope.

647-874-2352

Monday to Friday, 8am–5pm. After-hours by arrangement.

Request service

Service Request

We reply within one business day.